New Lakeview Village Townhome Building
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Electrical Contractor:Leaptrott Electric Inc,2319 W Front St Statesville, Nc 28677,7047555456|Mechanical Contractor :Painter Robert Kelly,1835 Lindbergh Street Charlotte, Nc 28208,7045514144|Plumbing Contractor :Combs Andrew Peter,3400 St Johns Parkway Sanford, Fl 32771,8779061113 Total Square Feet : 2,912
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Road, Manufacturing (Industrial), Residential, Commercial
- Location
- Charlotte, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about New Lakeview Village Townhome Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Electrical Contractor:Leaptrott Electric Inc,2319 W Front St Statesville, Nc 28677,7047555456|Mechanical Contractor :Painter Robert Kelly,1835 Lindbergh Street Charlotte, Nc 28208,7045514144|Plumbing Contractor :Combs Andrew Peter,3400 St Johns Parkway Sanford, Fl 32771,8779061113 Total Square Feet : 2,912 |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Charlotte |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Road, Manufacturing (Industrial), Residential, Commercial |
Article published date | 2025-09-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
