NEW LAND DEVT
Sector: Water Supply and Storage • Location: Egypt, Arab Republic of
Source: World Bank Group
The project consists of: (a) construction of irrigation and drainage work to service 24,000 feddans (net) of reclaimed desert land; (b) settlement of 4,000 smallholder in 20 villages and provision of necessary economic and social infrastructure; (c) provision of farm machinery, consultant services and training, and farm credit. In addition, the project includes a bilharzia component to consolidate
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Raw Materials, Government
- Location
- Egypt
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about NEW LAND DEVT
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of: (a) construction of irrigation and drainage work to service 24,000 feddans (net) of reclaimed desert land; (b) settlement of 4,000 smallholder in 20 villages and provision of necessary economic and social infrastructure; (c) provision of farm machinery, consultant services and training, and farm credit. In addition, the project includes a bilharzia component to consolidate the national program and to expand the control program into the project area and Giza Governorate. Major project benefits include provision of agricultural land and increased incomes for 4,000 low income farm families and unquantifiable benefits of increasing the control of bilharzia. The major risk is whether the actual management and organization of the project will be adequate. The design of the project with a staged development, simple irrigation system, and three tiered organizational structure (Central Coordinating Committee, Project Unit, and Regional Implementation Committee) should minimize this risk. Assurances were also obtained that the government would ensure the timely availability of adequate funds. |
Original sector | Agriculture, Fishing and Forestry |
Location
Country | Egypt |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Raw Materials, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
