New Lexington Wastewater Treatment Plant Improvements REBID
Sector: Water Supply and Storage • Location: New Lexington, Ohio, United States of America
Source: Dodge USA
The Project includes the following Work: Selective demolition and removal of existing equipment, installation of new process piping, valves and fittings, Installation of new miscellaneous metals, and pipe supports, new aeration blower and coarse bubble SS diffusers, removal and replacement of valves and piping, new progressive cavity sludge feed pump, new polymer feed equipment, removal of existin
- Status
- Closed
- Sector
- Water Supply and Storage, Metal, Government, Power Generation (CCGT), Waste Processing and Treatment, Chemical (Industrial), Manufacturing (Industrial), Commercial
- Location
- New Lexington, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about New Lexington Wastewater Treatment Plant Improvements REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project includes the following Work: Selective demolition and removal of existing equipment, installation of new process piping, valves and fittings, Installation of new miscellaneous metals, and pipe supports, new aeration blower and coarse bubble SS diffusers, removal and replacement of valves and piping, new progressive cavity sludge feed pump, new polymer feed equipment, removal of existing rotary fan press, installation of volute screw press, electrical power and control work. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | New Lexington |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Metal, Government, Power Generation (CCGT), Waste Processing and Treatment, Chemical (Industrial), Manufacturing (Industrial), Commercial |
Article published date | 2024-12-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
