New Lower School Garden House for Packer Collegiate Institute
One of 10,000+ projects Taiyo tracks in New York.
Source: Brooklyn Bridge Parents
Renovation of an 1869 brownstone into a 17,250-square-foot, four-level mass timber school building with wood structure, brick façade made of recycled clay, and two green roofs in Brooklyn Heights.
- Status
- Closed
- Sector
- Tunnel, Forest Products and Packaging, Mass Transit, Bridge, Residential, Commercial
- Location
- Brooklyn, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Brooklyn Bridge Parents
ConstructChat
Ask ConstructChat about New Lower School Garden House for Packer Collegiate Institute
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Renovation of an 1869 brownstone into a 17,250-square-foot, four-level mass timber school building with wood structure, brick façade made of recycled clay, and two green roofs in Brooklyn Heights. |
Original sector | Real Estate |
Location
Country | United States of America (USA) |
State | New York |
City | Brooklyn |
Source
Source | Brooklyn Bridge Parents |
URL |
More Details
Record type | Project |
Sector | Tunnel, Forest Products and Packaging, Mass Transit, Bridge, Residential, Commercial |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
