logo

New Main Office Building REBID

Sector: Water Supply and Storage • Location: Brandon, Mississippi, United States of America

Source: Dodge

Project
Closed

Construction of a new 15,000 square foot office building for the Pearl River Valley Water Supply District at Bobby Cleveland Park at Lakeshore. The project is expected to be completed by spring 2026. *** Construction is under way to replace one of the most used boat ramps at the Barnett Reservoir. The Rankin Ramp, which is near Shaggy's on the Rez, remains open while a new ramp is being built near

Status
Closed
Sector
Water Supply and Storage, Government, Car parking, Commercial, Automotive, Residential, Manufacturing (Industrial)
Location
Brandon, Mississippi, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about New Main Office Building REBID

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “New Main Office Building REBID” is an infrastructure initiative in the Water Supply and Storage sector, located in Brandon, Mississippi, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Construction of a new 15,000 square foot office building for the Pearl River Valley Water Supply District at Bobby Cleveland Park at Lakeshore. The project is expected to be completed by spring 2026. *** Construction is under way to replace one of the most used boat ramps at the Barnett Reservoir. The Rankin Ramp, which is near Shaggy's on the Rez, remains open while a new ramp is being built near it. The Pearl River Valley Water Supply District is the state agency responsible for managing th...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Mississippi

City

Brandon

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Car parking, Commercial, Automotive, Residential, Manufacturing (Industrial)

Article published date

2025-01-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project