New Manhole and Gravity Mains Upgrade
Sector: Water Supply and Storage • Location: Saskatchewan, Canada
Source: Infrastructure Canada
Objective: Solve back-pressure issues and increase the wastewater system capacity to allow for community growth. Scope: Plan, design and construct approximately 600 m of 150 mm diameter gravity collection mains, approximately 11 manholes, approximately 420 m of 150 mm diameter gravity mains to lagoon, and all associated works. Output: new gravity collection mains, new manholes, gravity mains to la
- Status
- Closed
- Sector
- Water Supply and Storage
- Location
- Saskatchewan, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about New Manhole and Gravity Mains Upgrade
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Objective: Solve back-pressure issues and increase the wastewater system capacity to allow for community growth. Scope: Plan, design and construct approximately 600 m of 150 mm diameter gravity collection mains, approximately 11 manholes, approximately 420 m of 150 mm diameter gravity mains to lagoon, and all associated works. Output: new gravity collection mains, new manholes, gravity mains to lagoon. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Saskatchewan |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage |
Article published date | 2026-05-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
