logo

New Mexico Weather Stations O&M

Sector: Advanced Electronics • Location: United States of America

Source: Grants.gov

Project
Archived

Given the time and resources spent on the Phase I and II studies and the upgraded and newly installed stations, as well as the importance of the UB Network for consumptive use estimates in the Upper Colorado River Basin, the parties want to ensure the stations will continue to be operated and maintained to an agreed level of standards, and that all collected data will be made available to any and

Project Information FAQ

Project Information

5 Q
The project “New Mexico Weather Stations O&M” is an infrastructure initiative in the Advanced Electronics sector, located in United States of America. Taiyo aggregates data on it from Grants.gov.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

archived

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Given the time and resources spent on the Phase I and II studies and the upgraded and newly installed stations, as well as the importance of the UB Network for consumptive use estimates in the Upper Colorado River Basin, the parties want to ensure the stations will continue to be operated and maintained to an agreed level of standards, and that all collected data will be made available to any and all users in a consistent format. This scope of work addresses the operation and maintenance, data quality control and assurance, and serving of the resulting data for the 2 new climate stations within the state of New Mexico in the Colorado River basin. Tasks 1. The contractor will operate and maintain the 2 new stations according to the American Society of Civil Engineers (ASCE) standards appropriate for operation and maintenance of this network (ASCE-EWRI 2005). Teleconnections with the home laboratory will allow daily examination of the sensor outputs. When a significant problem is identified, a site visit will be arranged, to correct the issue within seven (7) days. a. The contractor will provide documentation describing their maintenance procedures and logs of past maintenance upon request. 2. The contractor will ensure each station’s sensors are calibrated or checked against standards annually according to the American Society of Civil Engineers (ASCE) standards appropriate for calibration (ASCE-EWRI 2005) a. The contractor will provide documentation describing their calibration procedures and logs of past calibration upon request. 3. The contractor will perform regular (daily or every other day) quality assurance and quality control (QA/QC) on the collected data from all stations and will serve or host the final processed data via a website that is available to at least the four upper basin states (Wyoming, Utah, Colorado, and New Mexico), Upper Colorado River Commission, and Reclamation. a. The contractor will provide documentation describing their processing procedures and processing codes upon request

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data