New Multi Cell Recharge Basin Facility
Sector: Water Supply and Storage • Location: Lindsay, California, United States of America
Source: Dodge
Construction of a multi-cell recharge basin facility, including two turnouts and pump structures to divert surface water from Cottonwood Creek to increase groundwater storage. The project also includes pedestrian accessible conservation space with terraced grading, native plantings, a walking path, and parking space.
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Car parking, Commercial, Waste Processing and Treatment, Automotive
- Location
- Lindsay, California, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about New Multi Cell Recharge Basin Facility
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Construction of a multi-cell recharge basin facility, including two turnouts and pump structures to divert surface water from Cottonwood Creek to increase groundwater storage. The project also includes pedestrian accessible conservation space with terraced grading, native plantings, a walking path, and parking space. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Lindsay |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Car parking, Commercial, Waste Processing and Treatment, Automotive |
Article published date | 2025-02-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
