New Nuclear Medicine Manufacturing Facility
One of 10,000+ projects Taiyo tracks in Australia.
Source: Mirage News
ANSTO is developing a new Nuclear Medicine Manufacturing Facility (NMMF) at Lucas Heights to replace the existing Nuclear Medicine Processing and Distribution Facility. The facility will ensure continuous delivery of critical nuclear medicines in Australia, enhancing sovereign capability and healthcare system strength. Major construction is expected to begin in 2027, with operations starting in th
- Status
- Prospective
- Sector
- Nuclear, Hospital, Manufacturing (Industrial), Government
- Location
- Lucas Heights, Australia
- Updated
- 22 Jul 2026
- Source
- Mirage News
ConstructChat
Ask ConstructChat about New Nuclear Medicine Manufacturing Facility
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | ANSTO is developing a new Nuclear Medicine Manufacturing Facility (NMMF) at Lucas Heights to replace the existing Nuclear Medicine Processing and Distribution Facility. The facility will ensure continuous delivery of critical nuclear medicines in Australia, enhancing sovereign capability and healthcare system strength. Major construction is expected to begin in 2027, with operations starting in the mid-2030s. |
Original sector | Healthcare |
Location
Country | Australia |
City | Lucas Heights |
Source
Source | Mirage News |
URL |
More Details
Record type | Project |
Sector | Nuclear, Hospital, Manufacturing (Industrial), Government |
Article published date | 2025-12-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
