New Nuclear Power Plants in Indonesia
Sector: Nuclear • Location: Jakarta, Indonesia
Source: Tempo.co English
Indonesia plans to build nuclear power plants with a total capacity of about 4 gigawatts (GW) as part of its efforts to transition to cleaner energy sources. The initiative includes the construction of floating small modular reactors, although specific timelines and quantities have not been disclosed.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Planned |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Indonesia plans to build nuclear power plants with a total capacity of about 4 gigawatts (GW) as part of its efforts to transition to cleaner energy sources. The initiative includes the construction of floating small modular reactors, although specific timelines and quantities have not been disclosed. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
