logo
ProjectStart

New Office Building

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

Construct A 1,380 Sqft Office Building. (Unit#18, Type C Unit). Required To Be Floodproofed By Fema To An Elevation Of 907.70. The Shallow Frost Protected Foundation Design Utilizing The Asce32-01 Will Be Required On This Foundation System. This Permit Will Include The Shell Of The Building As Well As The Interior Fit-Up. The Interior Consists Of 4 Offices, Conference Room, Bathroom, And Mechanica

Status
Prospective
Sector
Manufacturing (Industrial), Car parking, Automotive, Residential, Power Transmission, Power Generation (CCGT), Commercial
Location
Fargo, North Dakota, United States of America
Updated
19 Nov 2026
Source
Dodge

ConstructChat

Ask ConstructChat about New Office Building

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “New Office Building” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Fargo, North Dakota, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

start

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Construct A 1,380 Sqft Office Building. (Unit#18, Type C Unit). Required To Be Floodproofed By Fema To An Elevation Of 907.70. The Shallow Frost Protected Foundation Design Utilizing The Asce32-01 Will Be Required On This Foundation System. This Permit Will Include The Shell Of The Building As Well As The Interior Fit-Up. The Interior Consists Of 4 Offices, Conference Room, Bathroom, And Mechanical Room. The Parking Lot Permit Was Issued To 3901 51St S. Square Feet: 1380

Budget

Location

Country

United States of America (USA)

State

North Dakota

City

Fargo

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Car parking, Automotive, Residential, Power Transmission, Power Generation (CCGT), Commercial

Article published date

2025-09-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project