New Pamban Bridge
Sector: Rail • Location: Tamil Nadu, India
Source: Global Construction Review
India’s first vertical-lift rail bridge, the New Pamban Bridge, connects the mainland with Rameswaram on Pamban island. It features a 73m-long vertical lift section and is designed to withstand a corrosive marine environment for 100 years.
- Status
- Closed
- Sector
- Rail, Bridge, Mass Transit, Government
- Location
- Tamil Nadu, India
- Updated
- 22 Jul 2026
- Source
- Global Construction Review
ConstructChat
Ask ConstructChat about New Pamban Bridge
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | India’s first vertical-lift rail bridge, the New Pamban Bridge, connects the mainland with Rameswaram on Pamban island. It features a 73m-long vertical lift section and is designed to withstand a corrosive marine environment for 100 years. |
Original sector | Transportation |
Budget |
Location
Country | India |
State | Tamil Nadu |
Source
Source | Global Construction Review |
URL |
More Details
Record type | Project |
Sector | Rail, Bridge, Mass Transit, Government |
Article published date | 2025-04-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
