New Park Development
Sector: Car parking • Location: Waukesha, Wisconsin, United States of America
Source: Dodge USA
Cardinal Ridge Park: Development will be planned in phases based upon the adopted Park Master Plan. For 2024, the park will be mass graded and access enhanced. Turf lawn and native prairie areas will be developed in 2024, as well as turn lanes, a driveway and parking lot constructed and utilities stubbed out for future phases. Riverwalk Plaza: The Riverwalk Plaza is possible in part through a part
- Status
- Prospective
- Sector
- Car parking, Power Transmission, Road, Government, Automotive, Commercial, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Waukesha, Wisconsin, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about New Park Development
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Cardinal Ridge Park: Development will be planned in phases based upon the adopted Park Master Plan. For 2024, the park will be mass graded and access enhanced. Turf lawn and native prairie areas will be developed in 2024, as well as turn lanes, a driveway and parking lot constructed and utilities stubbed out for future phases. Riverwalk Plaza: The Riverwalk Plaza is possible in part through a partnership with the developer of The Riverfront. The Plaza will be an entertainment and destination ... |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Waukesha |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Power Transmission, Road, Government, Automotive, Commercial, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2024-03-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
