New Park Office Electrical Construction
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
The office will replace the existing modular park office, which is energy inefficient, undersized, and has mold issues. The project consists of full site development, park office, vehicle parking and traffic flow, signage, utilities, and landscaping
- Status
- Closed
- Sector
- Power Transmission, Power Generation (CCGT), Car parking, Manufacturing (Industrial), Commercial, Automotive, Residential
- Location
- Derry, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about New Park Office Electrical Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The office will replace the existing modular park office, which is energy inefficient, undersized, and has mold issues. The project consists of full site development, park office, vehicle parking and traffic flow, signage, utilities, and landscaping |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Derry |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Power Generation (CCGT), Car parking, Manufacturing (Industrial), Commercial, Automotive, Residential |
Article published date | 2025-02-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
