New Park Pavilion Construction
Closed · Utah · Last reported Jun 2025
Source: Dodge
The project consists of constructing a durable, weather-resistant pavilion with the following features: Minimum Specifications: - Open-air structure with roof (metal or shingle) - Concrete slab foundation - Posts/support beams engineered to local building codes - Electrical wiring for lighting and future use (outlets, fans, etc.) - Size: approximately 30' x 60' - Optional: picnic tables, benches,
- Status
- Closed
- Sector
- Power Generation (CCGT), Car parking, Automotive, Cement, Government, Metal, Manufacturing (Industrial), Commercial
- Location
- Orderville, Utah, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about New Park Pavilion Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of constructing a durable, weather-resistant pavilion with the following features: Minimum Specifications: - Open-air structure with roof (metal or shingle) - Concrete slab foundation - Posts/support beams engineered to local building codes - Electrical wiring for lighting and future use (outlets, fans, etc.) - Size: approximately 30' x 60' - Optional: picnic tables, benches, or additional features (to be priced separately) - Deadline: Pavilion must be fully completed no ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Utah |
City | Orderville |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Car parking, Automotive, Cement, Government, Metal, Manufacturing (Industrial), Commercial |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
