New Parking Structure Construction
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The Parking Structure is designed with a footprint area of 57,101 SF and yields 491 parking spaces. The total area is 165,676 SF and the building efficiency is 337 SF/space. It is a Type IB - S2 Open Parking Structure as defined in the 2012 International Building Code. The project will also provide accommodations for photovoltaics (PV), electrical vehicle (EV) charging stations, and future parking
- Status
- Closed
- Sector
- Automotive, Electric Vehicles (EVs), Car parking, Power Transmission, Solar, Commercial, Power Generation (CCGT), Road, Manufacturing (Industrial), Cement
- Location
- Long Beach, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about New Parking Structure Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Parking Structure is designed with a footprint area of 57,101 SF and yields 491 parking spaces. The total area is 165,676 SF and the building efficiency is 337 SF/space. It is a Type IB - S2 Open Parking Structure as defined in the 2012 International Building Code. The project will also provide accommodations for photovoltaics (PV), electrical vehicle (EV) charging stations, and future parking structure expansion. The scope will also include site improvements including roadways, utility i... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Long Beach |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Automotive, Electric Vehicles (EVs), Car parking, Power Transmission, Solar, Commercial, Power Generation (CCGT), Road, Manufacturing (Industrial), Cement |
Article published date | 2024-07-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- SR 83 @ SHOAL CREEK
- ATLANTA STREETCAR EAST EXTENSION FROM JACKSON ST TO IRWIN ST
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
