New Pennsbury High School
Sector: Education • Location: Falls Township, Pennsylvania, United States
Source: AOL
A new $270 million Pennsbury High School is planned to be built with a size of 497,000 square feet. The school will include a three-story academic wing, a 1,000-seat auditorium, a large media center/library, and athletic facilities including a pool and wrestling room. The school will accommodate up to 3,000 students and is scheduled to open for the 2029-30 school year. Construction will start with
- Status
- Prospective
- Sector
- Education, Car parking, Automotive
- Location
- Falls Township, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- AOL
ConstructChat
Ask ConstructChat about New Pennsbury High School
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A new $270 million Pennsbury High School is planned to be built with a size of 497,000 square feet. The school will include a three-story academic wing, a 1,000-seat auditorium, a large media center/library, and athletic facilities including a pool and wrestling room. The school will accommodate up to 3,000 students and is scheduled to open for the 2029-30 school year. Construction will start with a groundbreaking on June 4, 2026, and is expected to be completed by August 2029. The new school will be built on the south side of the current campus along Hood Boulevard, with separate areas for bus loops, student parking, and staff parking. Existing high schools will continue to operate during construction, and the old buildings will be demolished after completion. |
Original sector | Education |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Falls Township |
Source
Source | AOL |
URL |
More Details
Record type | Project |
Sector | Education, Car parking, Automotive |
Article published date | 2026-05-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
