New Planet Fitness Building
One of 10,000+ projects Taiyo tracks in North Dakota.
Source: Dodge USA
Ground-Up Construction for assembly use fitness club. Required to be Floodproofed by FEMA and WSEIA to an elevation of 907.80. This submittal includes architectural, civil, structural, plumbing, mechanical, and electrical drawings. Fire sprinkler and fire alarm drawings to be submitted under seperate submittals. Square Feet: 31877
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Commercial, Manufacturing (Industrial)
- Location
- Fargo, North Dakota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about New Planet Fitness Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Ground-Up Construction for assembly use fitness club. Required to be Floodproofed by FEMA and WSEIA to an elevation of 907.80. This submittal includes architectural, civil, structural, plumbing, mechanical, and electrical drawings. Fire sprinkler and fire alarm drawings to be submitted under seperate submittals. Square Feet: 31877 |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Dakota |
City | Fargo |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Manufacturing (Industrial) |
Article published date | 2024-08-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
