New Providence Community Pool Superstructure Replacement
Closed · New Jersey · Last reported Oct 2024
Source: Dodge USA
The Project consists of one (1) Base Bid and one (1) Alternate Bid. The Base Bid includes installation of a fully engineered multi-piece modular bridge of steel construction with reinforced cast-in-place concrete deck, which shall be regarded as minimum standards for design and fabrication. The work shall consist of design, fabricating, finishing, transporting, and installing the steel modular rol
- Status
- Closed
- Sector
- Steel, Commercial, Road, Cement, Government, Bridge, Metal, Manufacturing (Industrial)
- Location
- New Providence, New Jersey, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about New Providence Community Pool Superstructure Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project consists of one (1) Base Bid and one (1) Alternate Bid. The Base Bid includes installation of a fully engineered multi-piece modular bridge of steel construction with reinforced cast-in-place concrete deck, which shall be regarded as minimum standards for design and fabrication. The work shall consist of design, fabricating, finishing, transporting, and installing the steel modular rolled girder bridge superstructure including bearings |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Jersey |
City | New Providence |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Steel, Commercial, Road, Cement, Government, Bridge, Metal, Manufacturing (Industrial) |
Article published date | 2024-11-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- REPLACE DAMAGED STEEL COLUMN
- Courthouse Commons Tunnel
- Los Angeles City Hall
