logo

New Pump House at Kaverinagar, Wakad

One of 10,000+ projects Taiyo tracks in Maharashtra.

Source: PUNE PULSE

Project
Completed

A new pump house was installed at Kaverinagar to ensure uninterrupted filling of the new water tank. It includes two 50 HP working pumps and one standby pump, with a 200 KVA independent power supply, a dedicated 200 KVA transformer, and two RMUs for high-voltage control.

Status
Closed
Sector
Power Generation (CCGT), Water Supply and Storage, Power Transmission, Government
Location
Pune, Maharashtra, India
Updated
22 Jul 2026
Source
PUNE PULSE

ConstructChat

Ask ConstructChat about New Pump House at Kaverinagar, Wakad

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “New Pump House at Kaverinagar, Wakad” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Pune, Maharashtra, India. Taiyo aggregates data on it from PUNE PULSE.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A new pump house was installed at Kaverinagar to ensure uninterrupted filling of the new water tank. It includes two 50 HP working pumps and one standby pump, with a 200 KVA independent power supply, a dedicated 200 KVA transformer, and two RMUs for high-voltage control.

Original sector

Water Supply

Location

Country

India

State

Maharashtra

City

Pune

Source

Source

PUNE PULSE

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Water Supply and Storage, Power Transmission, Government

Article published date

2025-11-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project