logo
ProjectPre-Design

New RDA Power Line Undergrounding

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

NV Energy owns and operates overhead transmission and distribution lines through the Las Vegas Redevelopment Area. Often these lines are located in alleyways, which serve to divide a City block and impede development of the full City block or adjacent parcels by requiring large building offsets from existing overhead poles that significantly limit the size of a potential redevelopment project . Th

Status
Prospective
Sector
Government, Power Transmission, Power Generation (CCGT), Commercial
Location
Las Vegas, Nevada, United States of America
Updated
19 Nov 2026
Source
Dodge

ConstructChat

Ask ConstructChat about New RDA Power Line Undergrounding

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “New RDA Power Line Undergrounding” is an infrastructure initiative in the Government sector, located in Las Vegas, Nevada, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Pre-Design

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

NV Energy owns and operates overhead transmission and distribution lines through the Las Vegas Redevelopment Area. Often these lines are located in alleyways, which serve to divide a City block and impede development of the full City block or adjacent parcels by requiring large building offsets from existing overhead poles that significantly limit the size of a potential redevelopment project . This Program would seek to underground distribution lines in corridors which have particular obstru...

Budget

Location

Country

United States of America (USA)

State

Nevada

City

Las Vegas

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Government, Power Transmission, Power Generation (CCGT), Commercial

Article published date

2025-01-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project