New Reclaimed Water Transmission Main - Project 2
Sector: Waste Processing and Treatment • Location: Peoria, Arizona, United States of America
Source: Dodge
This project will design and construct approximately five miles of new 24-inch reclaimed water transmission main that will connect the Jomax Water Reclamation Facility (WRF) to the Beardsley Water Reclamation Facility (BWRF). Reclaimed water produced at our Jomax WRF currently suffers from seasonal demand issues. By connecting the two reclaimed water systems together, the City eliminates these sea
- Status
- Prospective
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Commercial, Government
- Location
- Peoria, Arizona, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about New Reclaimed Water Transmission Main - Project 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project will design and construct approximately five miles of new 24-inch reclaimed water transmission main that will connect the Jomax Water Reclamation Facility (WRF) to the Beardsley Water Reclamation Facility (BWRF). Reclaimed water produced at our Jomax WRF currently suffers from seasonal demand issues. By connecting the two reclaimed water systems together, the City eliminates these seasonal issues and increases operational flexibility of the system in northern Peoria. The City of ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Arizona |
City | Peoria |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Commercial, Government |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- Imola Avenue Rehabilitation (Soscol Ave to East End)
- Laguna Canyon Road , Road Improvements ( Segment 4 ) ( Phases 2 to 4 )
- Panorama Heights Drainage and Road Improvements
- Modjeska Grade Road , Road and Drainage Improvements
- Street Drainage Improvements ( Annual )
- Barrett Lane Drainage and Sidewalk Improvement
- Ronald Caspers Wilderness Park - Maintenance Building - Renovation
- West Bay Yards
