New Residential Building
One of 10,000+ projects Taiyo tracks in Florida.
Source: Dodge USA
12/21/22 Reinstatement Cb14-06285 Ok Per Js Needs Building Final.....560 - Proposed Lot 9 , 8 -Model Home 3 , 2 - Townhomes Unit 3 Of 3 3/2.5/2 Per Sp 4415.10 Wt 9182W Peak 31' 6-28-16 Prepwr Ltr Rcd/Pd-Dks Reinstated With No Fee Per Gw Until Platted. 2-28-17- 3/15/22 Reinstatement 180 Days Duplicate Placard. Aym " " 12-12-17 Reinstated Permit For 180
- Status
- Prospective
- Sector
- Residential, Commercial, Manufacturing (Industrial)
- Location
- Dunedin, Florida, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about New Residential Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | **2/2/2024 Second Reinstatement Approved Cm** 12/21/22 Reinstatement Cb14-06285 Ok Per Js Needs Building Final.....560 - Proposed Lot 9 , 8 -Model Home 3 , 2 - Townhomes Unit 3 Of 3 3/2.5/2 Per Sp 4415.10 Wt 9182W Peak 31' 6-28-16 Prepwr Ltr Rcd/Pd-Dks Reinstated With No Fee Per Gw Until Platted. 2-28-17- 3/15/22 Reinstatement 180 Days Duplicate Placard. Aym " " 12-12-17 Reinstated Permit For 180 Days On 09-30-19(Revised 4-8-2024-Not A Model Home - Property Has Been Platted) |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Dunedin |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Residential, Commercial, Manufacturing (Industrial) |
Article published date | 2024-09-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
