New Residential Building
Sector: Water Supply and Storage • Location: Clearwater, Florida, United States of America
Source: Dodge
2016,2004 Sidney St, Clw 33763, Building 1,2, 3 Lot1, 4, Unit 2 Lot 5, Bldg 3, Unit 1 Right, New Sfr Villas, 3Bed/2Bath/2 Car/Shingle Roof/Natural Gas For Water Heater, Dryer & Range...Roof Peak Height 23' 5 1/4"...B/E/P/M/G..Noc Req On Site : Lot 7 Bldg 4 Unit 1 - New Sfr 3Bed/2Bath/2 Car/Shingle Roof, Ug Nat Gas For Range, Water Heater And Future Dryer...Total Living 1768 Sf Total Gross 2322 Sf.
- Status
- Under Construction
- Sector
- Water Supply and Storage, Automotive, Residential, Manufacturing (Industrial), Commercial, Natural Gas
- Location
- Clearwater, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about New Residential Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 2016,2004 Sidney St, Clw 33763, Building 1,2, 3 Lot1, 4, Unit 2 Lot 5, Bldg 3, Unit 1 Right, New Sfr Villas, 3Bed/2Bath/2 Car/Shingle Roof/Natural Gas For Water Heater, Dryer & Range...Roof Peak Height 23' 5 1/4"...B/E/P/M/G..Noc Req On Site : Lot 7 Bldg 4 Unit 1 - New Sfr 3Bed/2Bath/2 Car/Shingle Roof, Ug Nat Gas For Range, Water Heater And Future Dryer...Total Living 1768 Sf Total Gross 2322 Sf...B/E/P/M/G..Noc Req On Site Lot 8, Bldg 4, Unit 2 - New Sfr, 3Bed/2Bath/2Car/Shingle Roof, Ug Na... |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Clearwater |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Automotive, Residential, Manufacturing (Industrial), Commercial, Natural Gas |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
