New River Church Road Intersection Improvements
Sector: Natural Gas • Location: Tifton, Georgia, United States of America
Source: Dodge USA
In general, construction consists of 12-inch water main relocation, 6-inch-high pressure natural gas main relocation, widening, grading, drainage pipe and storm drain box improvements, curb and gutter, roadway base, asphalt, traffic signal installation, erosion and sedimentation control and all associated measures for the complete project.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Bid Results |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | In general, construction consists of 12-inch water main relocation, 6-inch-high pressure natural gas main relocation, widening, grading, drainage pipe and storm drain box improvements, curb and gutter, roadway base, asphalt, traffic signal installation, erosion and sedimentation control and all associated measures for the complete project. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Medium |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
