logo
ProjectConstruction

New River Point Building

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

River Point 3-Plex Bldg 15 Units 337 338 339,Bldg 17 Units 344 345 346 347 348, Bldg 18 Units 349 350 351 352 353 Bldg 14 Units 333 334 335 336, Bldg 16 Units 340 341342 343, Bldg 13 Units 241 242 243 244, 11 Units 235 236 237

Status
Under Construction
Sector
Commercial, Manufacturing (Industrial), Residential
Location
Lehi, Utah, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about New River Point Building

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “New River Point Building” is an infrastructure initiative in the Commercial sector, located in Lehi, Utah, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

River Point 3-Plex Bldg 15 Units 337 338 339,Bldg 17 Units 344 345 346 347 348, Bldg 18 Units 349 350 351 352 353 Bldg 14 Units 333 334 335 336, Bldg 16 Units 340 341342 343, Bldg 13 Units 241 242 243 244, 11 Units 235 236 237

Procurement method

Budget

Location

Country

United States of America (USA)

State

Utah

City

Lehi

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Manufacturing (Industrial), Residential

Article published date

2024-11-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project