New River Trail Connections
Sector: Car parking • Location: Peoria, Arizona, United States of America
Source: Dodge USA
This project provides for the design, ROW acquisition, and construction for seven trail connections between existing developments and the New River Trail System throughout the City. ROW acquisition is in progress and will not be fully completed in FY23. Therefore, funding is requested to be carried over to FY24.
- Status
- Prospective
- Sector
- Car parking, Mass Transit, Government, Automotive, Rail, Commercial
- Location
- Peoria, Arizona, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about New River Trail Connections
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project provides for the design, ROW acquisition, and construction for seven trail connections between existing developments and the New River Trail System throughout the City. ROW acquisition is in progress and will not be fully completed in FY23. Therefore, funding is requested to be carried over to FY24. |
Budget |
Location
Country | United States of America (USA) |
State | Arizona |
City | Peoria |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Mass Transit, Government, Automotive, Rail, Commercial |
Article published date | 2024-07-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
