logo

New Road Bridge Replacement Project

Sector: Road • Location: Lewes, Delaware, United States

Source: Cape Gazette

Project
Planned

The New Road Bridge replacement project in Lewes is set to begin in the fall of 2024. The new bridge will be elevated to clear Canary Creek by more than 7 feet, including new approach ways and a pedestrian path.

Status
Prospective
Sector
Road, Bridge, Government
Location
Lewes, Delaware, United States of America
Updated
22 Jul 2026
Source
Cape Gazette

ConstructChat

Ask ConstructChat about New Road Bridge Replacement Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “New Road Bridge Replacement Project” is an infrastructure initiative in the Road sector, located in Lewes, Delaware, United States. Taiyo aggregates data on it from Cape Gazette.

Participants

Sponsoring Agency

Status

Original status

Planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The New Road Bridge replacement project in Lewes is set to begin in the fall of 2024. The new bridge will be elevated to clear Canary Creek by more than 7 feet, including new approach ways and a pedestrian path.

Original sector

Transportation

Location

Country

United States of America (USA)

State

Delaware

City

Lewes

Source

Source

Cape Gazette

URL

More Details

Record type

Project

Sector

Road, Bridge, Government

Article published date

2025-03-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project