New Runnymede Park Nature Center
Sector: Raw Materials • Location: Herndon, Virginia, United States of America
Source: Dodge USA
A 4,000 square foot Nature Center at Runnymede Park with spaces for free and low-cost nature education activities, to include exhibits and equipment. The proposed design warrants a feasibility study and required code review to determine necessary changes as it is over 16 years old. Once assessed, new cost estimates for design and construction can be developed, programming and indoor exhibits updat
- Status
- Prospective
- Sector
- Raw Materials, Commercial, Car parking, Education, Government, Automotive
- Location
- Herndon, Virginia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about New Runnymede Park Nature Center
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A 4,000 square foot Nature Center at Runnymede Park with spaces for free and low-cost nature education activities, to include exhibits and equipment. The proposed design warrants a feasibility study and required code review to determine necessary changes as it is over 16 years old. Once assessed, new cost estimates for design and construction can be developed, programming and indoor exhibits updated and a staffing plan developed. The study should investigate and develop options for showcasing... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Virginia |
City | Herndon |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Commercial, Car parking, Education, Government, Automotive |
Article published date | 2024-10-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Raw Materials projects in United States of America
- SR 138@CR 55/NUNNALLY FARM RD RT TURN LN
- JUSTIN and J. LOHR Center for Wine and Viticulture
- William and Linda Frost Center for Research and Innovation
- ROOFTOP SOLAR PV INSTALL. (8) 400W MODULES AT 3.2 KW TOTAL. INSTALL (1) (N) ESS TELSA POWERWALL BATTERY AT 13.5 KWH.
- LIVESTOCK AMENDMENTS
- CUP AND MSPR FOR NEW INDUSTRIAL CAMPUS WITH 2 SHELL BUILDING (232,653 AND 154,618 SF) AT FORMER BERKELEY FARMS SITE
- VINYL-LINER SWIMMING POOL LOCATED IN REAR YARD
- Dwight D. Eisenhower Memorial
