logo

New Sagamore Bridge Replacement

Sector: Water Supply and Storage • Location: Sagamore, Massachusetts, United States

Source: AOL

Project
Under Construction

MassDOT's contractor, AA Will Corporation, began foundation load testing work on May 1, 2026, using cranes, vibratory pile hammers, testing jacks and frames, and other heavy equipment to drive piles and drill shafts deep into the ground as part of preparation for the construction of the new Sagamore Bridge. The work will continue for the next two to three months at four sites around the Sagamore B

Project Information FAQ

Project Information

3 Q
The project “New Sagamore Bridge Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in Sagamore, Massachusetts, United States. Taiyo aggregates data on it from AOL.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

under construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

MassDOT's contractor, AA Will Corporation, began foundation load testing work on May 1, 2026, using cranes, vibratory pile hammers, testing jacks and frames, and other heavy equipment to drive piles and drill shafts deep into the ground as part of preparation for the construction of the new Sagamore Bridge. The work will continue for the next two to three months at four sites around the Sagamore Bridge. Construction on one span of the new bridge is expected to begin in 2027, with the first span completed by 2033 and both spans by 2037. The project includes two massive bridges, bicycle lanes, and interchanges on either side of the Cape Cod Canal, using accelerated bridge construction techniques including prefabricated bridge arches floated down the canal.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data