New Sidewalks Project: 5th Avenue NE
The status, timeline and source of this project. A free account opens every field.
Source: City of Shoreline
The City of Shoreline is constructing new sidewalks for 5th Avenue NE, from NE 175th Street to near NE 182nd Court. The sidewalks will be built on both sides of the street and will connect to other new sidewalks that are under construction on 5th Avenue NE, north of 182nd Court, as part of Sound Transit’s 185th Street Link Light Rail Station. Project improvements include: Pedestrian facilities wit
- Status
- Closed
- Sector
- Car parking, Power Transmission, Rail, Road, Government, Automotive, Education, Power Generation (CCGT), Residential, Waste Processing and Treatment
- Location
- Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- City of Shoreline
ConstructChat
Ask ConstructChat about New Sidewalks Project: 5th Avenue NE
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closeout |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The City of Shoreline is constructing new sidewalks for 5th Avenue NE, from NE 175th Street to near NE 182nd Court. The sidewalks will be built on both sides of the street and will connect to other new sidewalks that are under construction on 5th Avenue NE, north of 182nd Court, as part of Sound Transit’s 185th Street Link Light Rail Station. Project improvements include: Pedestrian facilities with curbs and gutters, Curb ramps, Drainage improvements, Bicycle facilities, A new mid-block crossing from the west side of 5th Avenue NE, north of NE 182nd Court. The bicycle facilities will be added utilizing Sound Transit Access Funds. Constructing the bicycle facilities and sidewalk at the same time will be a cost savings and, along with Sound Transit improvements north of NE 182nd Court, will complete pedestrian/bicycle facilities from NE 175th Street to the Shoreline North/185th light rail station. These improvements will serve as one of the on-street segments of the Trail Along the Rail. |
Location
Country | United States of America (USA) |
State | Washington |
Source
Source reliability | High |
Source | City of Shoreline |
URL |
More Details
Record type | Project |
Sector | Car parking, Power Transmission, Rail, Road, Government, Automotive, Education, Power Generation (CCGT), Residential, Waste Processing and Treatment |
Article published date | 2023-12-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America (USA)
- Vanden Meadows
- Peachtree Creek – South Fork Green Infrastructure – Cheshire Bridge Road
- Green Infrastructure Design Challenge - Martin Luther King, Jr. Drive and Hunter Place
- GDOT/Intra-Government Agreements Utility Relocation
- Manchester Road (Route 100) Sidewalk/ADA Improvements
- Route OO Resurfacing Project in Laclede and Dallas Counties
- Cole County Routes M and E Road Improvements Project
- Route 92 over I-29 Interchange Project
