NEW SLUSSEN STOCKHOLM
The status, timeline and source of this project. A free account opens every field.
Source: European Investment Bank (EIB)
Reconstruction of the Slussen area in Stockholm, named after the locks between Lake Mälaren and the Baltic Sea, including renewal of the locks and the road bridges on top of the lock, and new construction of a bus terminal, an intermodal transport hub, bus lanes, bicycle and pedestrian paths.
- Status
- Prospective
- Sector
- Bridge, Road, Government, Consumer Products, Raw Materials
- Location
- Sweden
- Updated
- 19 Nov 2026
- Source
- European Investment Bank (EIB)
ConstructChat
Ask ConstructChat about NEW SLUSSEN STOCKHOLM
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | financed |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Reconstruction of the Slussen area in Stockholm, named after the locks between Lake Mälaren and the Baltic Sea, including renewal of the locks and the road bridges on top of the lock, and new construction of a bus terminal, an intermodal transport hub, bus lanes, bicycle and pedestrian paths. |
Original sector | Transport |
Budget |
Location
Country | Sweden |
Source
Source reliability | High |
Source | European Investment Bank (EIB) |
URL |
More Details
Record type | Project |
Sector | Bridge, Road, Government, Consumer Products, Raw Materials |
Article published date | 2023-05-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
