New Smyrna Beach - Underground Utility Improvement IQC
Sector: Water Supply and Storage • Location: New Smyrna Beach, Florida, United States of America
Source: Dodge
Provide underground utility work in theNSBU s water, wastewater and reclaimed water distribution system. This work shall include new construction and repair & rehabilitation of existing water, wastewater and reclaimed water infrastructure within NSBU s service territory. Provide pipe, pump and other mechanical work at the NSBU Water and Wastewater facilities, including but not limited to raw water
- Status
- Closed
- Sector
- Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Commercial, Power Generation (CCGT), Government
- Location
- New Smyrna Beach, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about New Smyrna Beach - Underground Utility Improvement IQC
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Provide underground utility work in theNSBU s water, wastewater and reclaimed water distribution system. This work shall include new construction and repair & rehabilitation of existing water, wastewater and reclaimed water infrastructure within NSBU s service territory. Provide pipe, pump and other mechanical work at the NSBU Water and Wastewater facilities, including but not limited to raw water wells, sewer lift stations, water and wastewater treatment plants and water pump stations. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | New Smyrna Beach |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Commercial, Power Generation (CCGT), Government |
Article published date | 2025-08-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
