logo

New Snake River Pool & Spa

Sector: Power Generation (CCGT) • Location: Nampa, Idaho, United States of America

Source: Dodge USA

Project
Start

Construct New Spa Showroom /Retail Space In Existing Suite Space. Selective Demolition Of Existing Non-Bearing Construction, Suspended Ceiling System, Electrical, Hvac & Plumbing. Installation Of (N)

Status
Prospective
Sector
Power Generation (CCGT), Commercial, Manufacturing (Industrial)
Location
Nampa, Idaho, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about New Snake River Pool & Spa

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “New Snake River Pool & Spa” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Nampa, Idaho, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

start

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Construct New Spa Showroom /Retail Space In Existing Suite Space. Selective Demolition Of Existing Non-Bearing Construction, Suspended Ceiling System, Electrical, Hvac & Plumbing. Installation Of (N)

Procurement method

Budget

Location

Country

United States of America (USA)

State

Idaho

City

Nampa

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Commercial, Manufacturing (Industrial)

Article published date

2023-07-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project