logo

New Solar Project by Duke Energy

Sector: Solar • Location: Idaho, United States

Source: Idaho Statesman

Project
Under Construction

Duke Energy is building another solar project near the Jackpot Solar farm, which will have a capacity of 100 megawatts and include 60 megawatts of battery storage, expected to be completed in 2024.

Status
Under Construction
Sector
Solar, Raw Materials, Power Generation (CCGT), Energy Storage, Commercial
Location
Idaho, United States of America
Updated
22 Jul 2026
Source
Idaho Statesman

ConstructChat

Ask ConstructChat about New Solar Project by Duke Energy

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “New Solar Project by Duke Energy” is an infrastructure initiative in the Solar sector, located in Idaho, United States. Taiyo aggregates data on it from Idaho Statesman.

Participants

Not available for this record.

Status

Original status

Under Construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Duke Energy is building another solar project near the Jackpot Solar farm, which will have a capacity of 100 megawatts and include 60 megawatts of battery storage, expected to be completed in 2024.

Original sector

Energy

Location

Country

United States of America (USA)

State

Idaho

Source

Source

Idaho Statesman

URL

More Details

Record type

Project

Sector

Solar, Raw Materials, Power Generation (CCGT), Energy Storage, Commercial

Article published date

2025-03-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project