New South Loop 4 Sidewalk (Downtown - Meadows at Buda)
Pre-design · Texas · Last reported Aug 2025
Source: Dodge
Construct a 6' sidewalk along S Loop 4 from West Goforth Road to IH-35 Southbound Frontage Road. The approximate length is 13,500 lf. The project would provide pedestrian connectivity to downtown Buda from the Meadows at Buda subdivision and the Robert S. Light Blvd. corridor. This will enable pedestrians to access businesses and job centers located along this roadway and will improve pedesterian
- Status
- Prospective
- Sector
- Road, Car parking, Commercial, Automotive, Government
- Location
- Buda, Texas, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about New South Loop 4 Sidewalk (Downtown - Meadows at Buda)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Construct a 6' sidewalk along S Loop 4 from West Goforth Road to IH-35 Southbound Frontage Road. The approximate length is 13,500 lf. The project would provide pedestrian connectivity to downtown Buda from the Meadows at Buda subdivision and the Robert S. Light Blvd. corridor. This will enable pedestrians to access businesses and job centers located along this roadway and will improve pedesterian connectivity. The City of Buda of may be seeking a consultant to provide Design services for the ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Buda |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Road, Car parking, Commercial, Automotive, Government |
Article published date | 2025-08-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
