New Starbucks Restaurant
Sector: Manufacturing (Industrial) • Location: Mesa, Arizona, United States of America
Source: Dodge
A New Ground Up Single Story Starbucks Restaurant Shell Building With Associated Mechanical, Electrical And Plumbing, And Site Work Including Civil And Landscaping On A Vacant 1.13 Acre Site On The Corner Of Warner Rd. And Ellsworth Rd. Deferred Fire Sprinklers. Deferred Fire Alarm. Special Inspections Required For Concrete, Fabricators, Steel, Masonry, Post Installed Anchors. Deferred Submittal F
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Power Generation (CCGT), Commercial, Rail, Raw Materials, Cement, Steel, Metal, Consumer Products
- Location
- Mesa, Arizona, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about New Starbucks Restaurant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A New Ground Up Single Story Starbucks Restaurant Shell Building With Associated Mechanical, Electrical And Plumbing, And Site Work Including Civil And Landscaping On A Vacant 1.13 Acre Site On The Corner Of Warner Rd. And Ellsworth Rd. Deferred Fire Sprinklers. Deferred Fire Alarm. Special Inspections Required For Concrete, Fabricators, Steel, Masonry, Post Installed Anchors. Deferred Submittal For Roof Hatch, Railing And Gate; Roof Access Ladder; Storefront And Curtain Wall Glazing Systems.... |
Budget |
Location
Country | United States of America (USA) |
State | Arizona |
City | Mesa |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Power Generation (CCGT), Commercial, Rail, Raw Materials, Cement, Steel, Metal, Consumer Products |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
