New Student Union Center Construction at Alabama CCS
Sector: Power Generation (CCGT) • Location: Tanner, Alabama, United States of America
Source: Dodge
The Project consists of the construction of a new student union center of approximately 25,400 sf to provide students with an area with food service, study and social areas along with consolidating and relocating bookstore and library services into one location to properly serve students. a. General facility infrastructure including circulation spaces, storage, restrooms, mechanical and electrical
- Status
- Prospective
- Sector
- Power Generation (CCGT), Power Transmission, Commercial, Education
- Location
- Tanner, Alabama, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about New Student Union Center Construction at Alabama CCS
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | gc bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project consists of the construction of a new student union center of approximately 25,400 sf to provide students with an area with food service, study and social areas along with consolidating and relocating bookstore and library services into one location to properly serve students. a. General facility infrastructure including circulation spaces, storage, restrooms, mechanical and electrical rooms, utility areas, and similar spaces. b. Demolition and/ or relocation of existing structure... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Alabama |
City | Tanner |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Power Transmission, Commercial, Education |
Article published date | 2025-08-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
