New Submersible Pumps - King’s Point
Sector: Water Supply and Storage • Location: Newfoundland and Labrador, Canada
Source: Infrastructure Canada
The Project consists of upgrading to the water distribution system in the Town of King’s Point. The scope of the project includes supply and installation of new submersible pumps, piping, vales, fittings and control panel. The Project aims to increase the reliability of the Town’s water distribution system to provide potable water to its residents.
- Status
- Closed
- Sector
- Water Supply and Storage, Government
- Location
- Newfoundland and Labrador, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about New Submersible Pumps - King’s Point
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project consists of upgrading to the water distribution system in the Town of King’s Point. The scope of the project includes supply and installation of new submersible pumps, piping, vales, fittings and control panel. The Project aims to increase the reliability of the Town’s water distribution system to provide potable water to its residents. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Newfoundland and Labrador |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government |
Article published date | 2025-10-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
