New Summit Ridge Villas II Building
Sector: Manufacturing (Industrial) • Location: Oklahoma City, Oklahoma, United States of America
Source: Dodge USA
Summit Ridge Villas Ii Building Residential Duplex 302-300 Trail Ridge Rd Blk 11,Building Residential Duplex 214-212 Trail Ridge Rd Blk 11 Lots 8A-8B This permit is for this specific structure only. Any other structures that are shown on this site plan that are in need of a permit will require a separate permit. Stamped Plans must be on site for review by the Inspector Must have 1 door that is min
- Status
- Under Construction
- Sector
- Manufacturing (Industrial), Residential, Commercial
- Location
- Oklahoma City, Oklahoma, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about New Summit Ridge Villas II Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Summit Ridge Villas Ii Building Residential Duplex 302-300 Trail Ridge Rd Blk 11,Building Residential Duplex 214-212 Trail Ridge Rd Blk 11 Lots 8A-8B This permit is for this specific structure only. Any other structures that are shown on this site plan that are in need of a permit will require a separate permit. Stamped Plans must be on site for review by the Inspector Must have 1 door that is min 3068 leading outside All bedrooms must have 1 window or door leading outside that has a min open... |
Budget |
Location
Country | United States of America (USA) |
State | Oklahoma |
City | Oklahoma City |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Residential, Commercial |
Article published date | 2025-01-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- CR 275/RIVER ROAD FROM SR 65 TO CR 11/SLASH ROAD
- SOUTH VALDOSTA TRUCK BYPASS
- CR 92/WRIGHTS MILL ROAD @ HUDSON RIVER 7.3 MI SE OF HOMER
- BRIDGE PRESERVATION @ 7 LOCS IN CLARKE & WALTON COUNTY
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
- CR 526/OLD MACON RD FM EVERGREEN RD TO WILKINSON COUNTY LINE
- SR 7/US 341 @ SR 74
- ASHFORD-DUNWOODY ROAD EB RAMP @ I-285
