logo
ProjectStart

New Target Store

Sector: Automotive • Location: Millington, Tennessee, United States of America

Source: Dodge USA

Electrify America TN240075 Electrify America, LLC proposes to install 6 electric vehicle charging posts, associated cabinets, (1) 20' light pole in the parking lot located at the Target Store at 5959 Poplar Ave., Memphis, TN. Equipment list: (1) Switchboard Assembly (3) 360 kW Signet Power Unit (6) 350 kW Signet Gen IV EV dispensers (1) 20' light pole PLEASE NOTE: MLGW, the local utility company h

Status
Under Construction
Sector
Automotive, Electric Vehicles (EVs), Car parking, Power Transmission, Power Generation (CCGT), Road, Commercial, Residential, Manufacturing (Industrial)
Location
Millington, Tennessee, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about New Target Store

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “New Target Store” is an infrastructure initiative in the Automotive sector, located in Millington, Tennessee, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Start

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Electrify America TN240075 Electrify America, LLC proposes to install 6 electric vehicle charging posts, associated cabinets, (1) 20' light pole in the parking lot located at the Target Store at 5959 Poplar Ave., Memphis, TN. Equipment list: (1) Switchboard Assembly (3) 360 kW Signet Power Unit (6) 350 kW Signet Gen IV EV dispensers (1) 20' light pole PLEASE NOTE: MLGW, the local utility company has assigned address: 6001 US Hwy 72 (Poplar Ave), Memphis, TN 38119 to this EV charger site.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Tennessee

City

Millington

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Automotive, Electric Vehicles (EVs), Car parking, Power Transmission, Power Generation (CCGT), Road, Commercial, Residential, Manufacturing (Industrial)

Article published date

2024-04-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project