New Target Store
Sector: Automotive • Location: Millington, Tennessee, United States of America
Source: Dodge USA
Electrify America TN240075 Electrify America, LLC proposes to install 6 electric vehicle charging posts, associated cabinets, (1) 20' light pole in the parking lot located at the Target Store at 5959 Poplar Ave., Memphis, TN. Equipment list: (1) Switchboard Assembly (3) 360 kW Signet Power Unit (6) 350 kW Signet Gen IV EV dispensers (1) 20' light pole PLEASE NOTE: MLGW, the local utility company h
- Status
- Under Construction
- Sector
- Automotive, Electric Vehicles (EVs), Car parking, Power Transmission, Power Generation (CCGT), Road, Commercial, Residential, Manufacturing (Industrial)
- Location
- Millington, Tennessee, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about New Target Store
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Electrify America TN240075 Electrify America, LLC proposes to install 6 electric vehicle charging posts, associated cabinets, (1) 20' light pole in the parking lot located at the Target Store at 5959 Poplar Ave., Memphis, TN. Equipment list: (1) Switchboard Assembly (3) 360 kW Signet Power Unit (6) 350 kW Signet Gen IV EV dispensers (1) 20' light pole PLEASE NOTE: MLGW, the local utility company has assigned address: 6001 US Hwy 72 (Poplar Ave), Memphis, TN 38119 to this EV charger site. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Tennessee |
City | Millington |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Automotive, Electric Vehicles (EVs), Car parking, Power Transmission, Power Generation (CCGT), Road, Commercial, Residential, Manufacturing (Industrial) |
Article published date | 2024-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- SR 83 @ SHOAL CREEK
- ATLANTA STREETCAR EAST EXTENSION FROM JACKSON ST TO IRWIN ST
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
