logo

New Terminal 3 Utility Design Project

Sector: Water Supply and Storage • Location: Hoquiam, Washington, United States of America

Source: Dodge

Project
Pre-Design

Proposal NameCity of Hoquiam Terminal 3 (T3) Utility Design ProjectProposal DescriptionThe Project is required to bring sewer service and replace a waterline taken out of service due to failures tothe proposed Pacific Northwest Renewable Energy industrial pellet plant at the Port of Grays Harbor property

Status
Prospective
Sector
Water Supply and Storage, Government, Waste Processing and Treatment, Manufacturing (Industrial), Commercial, Power Transmission, Seaport, Power Generation (CCGT)
Location
Hoquiam, Washington, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about New Terminal 3 Utility Design Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “New Terminal 3 Utility Design Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Hoquiam, Washington, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Pre-Design

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Proposal NameCity of Hoquiam Terminal 3 (T3) Utility Design ProjectProposal DescriptionThe Project is required to bring sewer service and replace a waterline taken out of service due to failures tothe proposed Pacific Northwest Renewable Energy industrial pellet plant at the Port of Grays Harbor property

Procurement method

Budget

Location

Country

United States of America (USA)

State

Washington

City

Hoquiam

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Waste Processing and Treatment, Manufacturing (Industrial), Commercial, Power Transmission, Seaport, Power Generation (CCGT)

Article published date

2025-04-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project