New Thrive Classroom Buildings
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
New Modular Thrive Classroom Building(s) for LUSD to be located at Campus Park, Yamato Colony & Selma Herndon Elementary Schools - Livingston, California Fabricate, transport and install a 1,440 sf, mono-roof slope, standing seam metal roofing, moment frame building, utilizing a 15'x32.5' module. The building must have a DSA approved PC, 7 feet overhangs at the front of the building with 2' sidewa
- Status
- Under Construction
- Sector
- Metal, Education, Power Transmission, Manufacturing (Industrial), Power Generation (CCGT), Car parking, Commercial, Automotive, Government
- Location
- Livingston, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about New Thrive Classroom Buildings
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | New Modular Thrive Classroom Building(s) for LUSD to be located at Campus Park, Yamato Colony & Selma Herndon Elementary Schools - Livingston, California Fabricate, transport and install a 1,440 sf, mono-roof slope, standing seam metal roofing, moment frame building, utilizing a 15'x32.5' module. The building must have a DSA approved PC, 7 feet overhangs at the front of the building with 2' sidewall and rear overhangs, Hollow metal doors and windows, tackboard at interior classroom walls, FRP... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Livingston |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Education, Power Transmission, Manufacturing (Industrial), Power Generation (CCGT), Car parking, Commercial, Automotive, Government |
Article published date | 2024-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
