New Townhome Building
Sector: Car parking • Location: Clearwater, Florida, United States of America
Source: Dodge
New Construction Townhome Unit 1 Of 4 - Unit Type A - 4 Bedroom 3.5 Bathroom Townhome Unit W/ 2 Car Garage (Part Of Appropved Site Plan Stp-22-00038 (4737) Delevopment)...Covered Entry, Lanai, Ac In Rear, Natural Gas...Midpoint Roof Height 25' 2.5" ...Total Living 2250 Sf Total Gross 2775 Sf...B/E/P/M/G...Noc Req On Site | Total SQ ft : 15,608
- Status
- Under Construction
- Sector
- Car parking, Automotive, Residential, Manufacturing (Industrial), Commercial, Natural Gas
- Location
- Clearwater, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about New Townhome Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | New Construction Townhome Unit 1 Of 4 - Unit Type A - 4 Bedroom 3.5 Bathroom Townhome Unit W/ 2 Car Garage (Part Of Appropved Site Plan Stp-22-00038 (4737) Delevopment)...Covered Entry, Lanai, Ac In Rear, Natural Gas...Midpoint Roof Height 25' 2.5" ...Total Living 2250 Sf Total Gross 2775 Sf...B/E/P/M/G...Noc Req On Site | Total SQ ft : 15,608 |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Clearwater |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Car parking, Automotive, Residential, Manufacturing (Industrial), Commercial, Natural Gas |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
