New Townhome Building
Sector: Car parking • Location: Chantilly, Virginia, United States of America
Source: Dodge
9016A New 2 Over 2 Condo/ Matisse (1St & 2Nd Fl)/ Elevation G/ 1 Car Rear Garage/Rear Deck. Ellipse 3004D Strauss Attic E // New 3 Story Townhome W/ Attic // Elevation B // Ground Level - Covered Front Stoop, Finished W/ Bedroom, No Wet Bar, No 2Nd Kitchen, 2 Car Rear Load Garage // Habitable Attic W/ Bedroom & Rear Roof Deck Ellipse 3004C Strauss E // New 3 Story Townhome // Elevation A // Ground
- Status
- Under Construction
- Sector
- Car parking, Commercial, Automotive, Residential, Manufacturing (Industrial)
- Location
- Chantilly, Virginia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about New Townhome Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 9016A New 2 Over 2 Condo/ Matisse (1St & 2Nd Fl)/ Elevation G/ 1 Car Rear Garage/Rear Deck. Ellipse 3004D Strauss Attic E // New 3 Story Townhome W/ Attic // Elevation B // Ground Level - Covered Front Stoop, Finished W/ Bedroom, No Wet Bar, No 2Nd Kitchen, 2 Car Rear Load Garage // Habitable Attic W/ Bedroom & Rear Roof Deck Ellipse 3004C Strauss E // New 3 Story Townhome // Elevation A // Ground Level - Covered Front Stoop, Finished W/ Bedroom, No Wet Bar, No 2Nd Kitchen, 2 Car Rear Load Ga... |
Budget |
Location
Country | United States of America (USA) |
State | Virginia |
City | Chantilly |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Car parking, Commercial, Automotive, Residential, Manufacturing (Industrial) |
Article published date | 2025-09-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
