logo
ProjectConstruction

New Townhome Building

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

Unit B (A-B) Electrical Contractor - Msf Electric Inc | Mechanical Contractor - Comfort Air, Inc.| Plumbing Contractor - Tanner Dixon |Unit B (A-b)|maximum Story :2|Unit B (A-B), Unit A (A-B) |Residential Townhome (2 Units) Unit B (A-B) |total Sq Ft :41,790| New Construction Holly Springs Elevation A Plan Lh-Garage Mono Slab|MAXIMUM STORY :2||Total Sq Ft :3980| New Construction Holly Springs Eleva

Status
Under Construction
Sector
Power Generation (CCGT), Commercial, Car parking, Manufacturing (Industrial), Automotive, Residential
Location
Greenville, North Carolina, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about New Townhome Building

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “New Townhome Building” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Greenville, North Carolina, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Unit B (A-B) Electrical Contractor - Msf Electric Inc | Mechanical Contractor - Comfort Air, Inc.| Plumbing Contractor - Tanner Dixon |Unit B (A-b)|maximum Story :2|Unit B (A-B), Unit A (A-B) |Residential Townhome (2 Units) Unit B (A-B) |total Sq Ft :41,790| New Construction Holly Springs Elevation A Plan Lh-Garage Mono Slab|MAXIMUM STORY :2||Total Sq Ft :3980| New Construction Holly Springs Elevation A Plan Rh-Garage Mono Slab Total Square Feet: 51,740

Budget

Location

Country

United States of America (USA)

State

North Carolina

City

Greenville

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Commercial, Car parking, Manufacturing (Industrial), Automotive, Residential

Article published date

2025-09-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project