logo
ProjectPre-Construction

New Transit Facility Construction

Pre-construction · Prince Edward Island

Source: Infrastructure Canada

This project consists of preparing for the arrival of the electric buses by purchasing land for transit operation and future expansion and constructing the necessary facility for the maintenance, storage, and operation of electric buses. The scope of work includes the construction of a new transit facility comprising vehicle storage and maintenance areas to accommodate the charging, parking (stora

Status
Prospective
Sector
Solar, Energy Storage, Power Transmission, Power Generation (CCGT), Electric Vehicles (EVs), Car parking, Commercial, Automotive, Government
Location
Prince Edward Island, Canada
Updated
19 Nov 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about New Transit Facility Construction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “New Transit Facility Construction” is an infrastructure initiative in the Solar sector, located in Prince Edward Island, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

pre-construction

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

This project consists of preparing for the arrival of the electric buses by purchasing land for transit operation and future expansion and constructing the necessary facility for the maintenance, storage, and operation of electric buses. The scope of work includes the construction of a new transit facility comprising vehicle storage and maintenance areas to accommodate the charging, parking (storage), and ongoing maintenance for the new and existing fleet. The new Bus Maintenance Facility will be built adjacent to the existing Bus Facility and Offices and will include storage bays for 19 electric buses, 3 maintenance bays, with parts storage and mezzanines. The new building will be approximately 1,777 m² (19,122 ft°), one story height of approximately 9.05 m (29’-10”), with mezzanines in the maintenance bays and in the storage bays. The mezzanine in the storage bay, adjacent to the maintenance bays, will be 200 m² (2,152 ft²), and will house storage, washrooms, showers, training room, lunchroom, and service rooms. The scope also includes the purchase of a 400kwh Solar Battery Energy Storage System (BESS) that will be installed at the new facility that will control energy demand for the electric bus charging and help reduce utility costs associated with vehicle charging as well as the purchase and install of 4, in-depot electric vehicle chargers. The aim of the project is to prepare for the arrival of the electric transit fleet and ensure that the transit system is equipped with a facility that will be suitable for maintenance, storage and charging of the electric fleet.

Original sector

Public Transit

Budget

Location

Country

Canada

State

Prince Edward Island

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Solar, Energy Storage, Power Transmission, Power Generation (CCGT), Electric Vehicles (EVs), Car parking, Commercial, Automotive, Government

Article published date

2025-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project