logo

New Transit Facility Construction

Sector: Solar • Location: Prince Edward Island, Canada

Source: Infrastructure Canada

Project
Pre-Construction

This project consists of preparing for the arrival of the electric buses by purchasing land for transit operation and future expansion and constructing the necessary facility for the maintenance, storage, and operation of electric buses. The scope of work includes the construction of a new transit facility comprising vehicle storage and maintenance areas to accommodate the charging, parking (stora

Project Information FAQ

Project Information

5 Q
The project “New Transit Facility Construction” is an infrastructure initiative in the Solar sector, located in Prince Edward Island, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

pre-construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project consists of preparing for the arrival of the electric buses by purchasing land for transit operation and future expansion and constructing the necessary facility for the maintenance, storage, and operation of electric buses. The scope of work includes the construction of a new transit facility comprising vehicle storage and maintenance areas to accommodate the charging, parking (storage), and ongoing maintenance for the new and existing fleet. The new Bus Maintenance Facility will be built adjacent to the existing Bus Facility and Offices and will include storage bays for 19 electric buses, 3 maintenance bays, with parts storage and mezzanines. The new building will be approximately 1,777 m² (19,122 ft°), one story height of approximately 9.05 m (29’-10”), with mezzanines in the maintenance bays and in the storage bays. The mezzanine in the storage bay, adjacent to the maintenance bays, will be 200 m² (2,152 ft²), and will house storage, washrooms, showers, training room, lunchroom, and service rooms. The scope also includes the purchase of a 400kwh Solar Battery Energy Storage System (BESS) that will be installed at the new facility that will control energy demand for the electric bus charging and help reduce utility costs associated with vehicle charging as well as the purchase and install of 4, in-depot electric vehicle chargers. The aim of the project is to prepare for the arrival of the electric transit fleet and ensure that the transit system is equipped with a facility that will be suitable for maintenance, storage and charging of the electric fleet.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data