New Vehicle Maintenance Facility
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Perform necessary surveys and investigations essential for the proper preparation of project plans, specification and cost estimates at the schematic (35%), preliminary design (65%) , pre-final (90% and final construction documents (100% design) to construct a new Vehicle Maintenance Facility (VMF) for the New Jersey Army National Guard. The primary facility shall be comprised of 41,086 SF of main
- Status
- Prospective
- Sector
- Automotive, Manufacturing (Industrial), Commercial, Residential
- Location
- Vineland, New Jersey, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about New Vehicle Maintenance Facility
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | gc bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Perform necessary surveys and investigations essential for the proper preparation of project plans, specification and cost estimates at the schematic (35%), preliminary design (65%) , pre-final (90% and final construction documents (100% design) to construct a new Vehicle Maintenance Facility (VMF) for the New Jersey Army National Guard. The primary facility shall be comprised of 41,086 SF of maintenance shops, 440 SF of Bulk POL storage, 660 SF of flammable materials storage, 330 SF of contr... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Jersey |
City | Vineland |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Automotive, Manufacturing (Industrial), Commercial, Residential |
Article published date | 2025-09-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- SR 83 @ SHOAL CREEK
- ATLANTA STREETCAR EAST EXTENSION FROM JACKSON ST TO IRWIN ST
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
