logo

New Wells Installation Project

Sector: Oil and Gas • Location: Los Angeles, California, United States of America

Source: Los Angles Department of Water and Power (LADWP)

Project
Ongoing

The Los Angeles Department of Water and Power (LADWP) is currently undertaking the Groundwater Monitoring and Production Well Installation Project which will provide new groundwater monitoring and production wells throughout the Los Angeles area. LADWP will use the monitoring wells to characterize groundwater conditions in key groundwater basins, including in the San Fernando Valley Groundwater Ba

Project Information FAQ

Project Information

4 Q
The project “New Wells Installation Project” is an infrastructure initiative in the Oil and Gas sector, located in Los Angeles, California, United States of America. Taiyo aggregates data on it from Los Angles Department of Water and Power (LADWP).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ongoing

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Los Angeles Department of Water and Power (LADWP) is currently undertaking the Groundwater Monitoring and Production Well Installation Project which will provide new groundwater monitoring and production wells throughout the Los Angeles area. LADWP will use the monitoring wells to characterize groundwater conditions in key groundwater basins, including in the San Fernando Valley Groundwater Basin. LADWP will also use the information from some of the wells for National Oil and Hazardous Substances Pollution Contingency Plan (NCP) compliant response actions at North Hollywood East Wellfield, North Hollywood West Wellfield, Southern San Fernando Basin Wellfields, Mission Wellfield, and Manhattan Wellfield. In addition, LADWP will use one of the monitoring wells to evaluate an upcoming groundwater replenishment project. The new production wells will augment or replace older production wells with diminishing capacity to enhance LADWP’s ability to pump the City’s adjudicated groundwater rights. LADWP intends to install these wells over a three-year period, starting in 2021.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data