New Westminster Secondary School Replacement Project
Sector: Car parking • Location: Canada
Source: Infrastructure BC
The New Westminster Secondary School Replacement Project accommodates 1,900 grade 9 to 12 students. The new school provides a state-of-the-art learning environment. It was designed to optimize the use of flexible learning spaces to maximize collaboration and active learning and include technology that enriches the learning process. Multi-purpose spaces and modern shops, as well as contemporary fin
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The New Westminster Secondary School Replacement Project accommodates 1,900 grade 9 to 12 students. The new school provides a state-of-the-art learning environment. It was designed to optimize the use of flexible learning spaces to maximize collaboration and active learning and include technology that enriches the learning process. Multi-purpose spaces and modern shops, as well as contemporary fine and performing arts spaces enhance the environment for the school community. It also meets today’s standards for modern learning, safety and accessibility, and incorporate the latest sustainable energy and waste management systems. The Project included a facility that is approximately 19,800 m2 (building gross area) including: Learning space; Parking for staff, students and visitors; Field / outdoor athletic space; and Flexibility to allow for future expansion. The new school was constructed adjacent to the current New Westminster Secondary School (NWSS) using a design-build procurement approach. NWSS will remain fully operational throughout construction. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
